The process includes:
Drilling small 50mm diameter boreholes, usually 3-4m deep
Collecting soil samples
Analysing site soil conditions
Analysing soil samples
Preparing a soil classification report
The site visit usually takes 30 to 60 minutes.
Site testing is usually completed in one visit.
Reports are typically completed within a week or so once samples are delivered.
Additional visits may be required for bearing capacity assessments.